01
Regulated need
WEEE requirements create a recycling obligation for solar panels when they reach end of life.
RECYCLONUK
Book meeting
RECYCLON UK · SEED ROUND OPEN
A dedicated route for end of life solar panels as repowering accelerates. Recyclon combines a regulated recycling need with a planned recovery model based on gate fees and recovered materials.
For prospective investors. Capital at risk. Projected figures and tax treatment are not guaranteed.
THE OPPORTUNITY
The UK had 22 GW of installed solar capacity in 2026. Recyclon’s November 2026 forecast estimates annual panel decommissioning at over 15,000 tonnes by 2030 and over 100,000 tonnes by 2035, from under 2,000 tonnes today. Solar panels are classified as electronic waste under UK WEEE rules, creating a recycling obligation.
Early UK solar farms from 2010 to 2013 are entering a repowering window. Recyclon is designed to process panels at a dedicated domestic facility rather than rely on fragmented routes.
01
WEEE requirements create a recycling obligation for solar panels when they reach end of life.
02
Older solar farms are being assessed for replacement with higher output modules.
03
Recyclon is planned as a dedicated UK facility for high recovery processing.
THE SOLUTION
The planned facility will use a CE certified processing line designed to process up to 430,000 modules a year with three operators per shift.
The revised plan also includes integration with a digital carbon monitoring platform. It is intended to record each batch’s processing volumes, energy use and recovered materials, then estimate avoided emissions. Carbon calculations remain subject to testing and validation.
INVESTMENT TERMS
Terms below are drawn from the current priced equity term sheet.
FINANCIAL PROJECTIONS
These figures are projections, not guarantees, drawn from Recyclon’s November 2026 model and investor materials. Annual revenue and EBITDA refer to Year 5 (2031). Outcomes depend on feedstock volumes, material prices, operating costs, financing and delivery.
The model forecasts approximately 329,000 panels processed in Year 5, compared with the line’s stated annual design capacity of approximately 430,000 modules. Year 5 revenue comprises approximately 38% gate fees and 62% recovered material sales. The model projects profitability from Year 3; carbon credit commercialisation is excluded.
DELIVERY MODEL
Panels are accepted through the planned facility intake and gate fee model.
Automation separates aluminium, copper, glass, silicon and plastic without chemical processing.
Recovered materials are intended for resale into established material markets.
THE TEAM
RJ
24 years in the energy sector, including solar. His background includes PETRONAS and Upsidevalue executive roles, Panasol facility delivery and a Go Global Award.
JC
Experience in solar manufacturing and operational leadership, including SunPower, Merlin Solar and Texas Instruments.
MB
Energy sector and facility-design experience, including work on the Panasol facility and senior engineering leadership roles.
WHY INVEST
The investment case should be assessed against the complete materials, diligence requirements and an investor’s own objectives. The page identifies the areas the proposed model is built around.
NEXT STEP
Book a discussion with Stuart Storrer, or request the investor pack for review.
INVESTOR PACK
Send your details to Stuart Storrer. He will reply directly with the current investor pack and next steps.
We collect only the details needed to respond to this request and manage the related investor conversation. Nothing is sold or added to a general marketing list.
REQUEST RECEIVED
Your request has been sent directly to Stuart. He will reply by email with the investor materials and next steps.