RECYCLON UK · SEED ROUND OPEN

The UK’s most advanced dedicated solar panel recycling facility

A dedicated route for end of life solar panels as repowering accelerates. Recyclon combines a regulated recycling need with a planned recovery model based on gate fees and recovered materials.

For prospective investors. Capital at risk. Projected figures and tax treatment are not guaranteed.

Seed raise£1.5M
Pre money valuation£8.5M
Annual capacity430kmodules
Recovery target99.8%material purity

THE OPPORTUNITY

A recycling requirement that is moving closer

The UK had 22 GW of installed solar capacity in 2026. More than 100,000 tonnes of panels are projected to reach decommissioning by 2030. Solar panels are classified as electronic waste under UK WEEE rules, creating a recycling obligation.

Early UK solar farms from 2010 to 2013 are entering a repowering window. Recyclon is designed to process panels at a dedicated domestic facility rather than rely on fragmented routes.

01

Regulated need

WEEE requirements create a recycling obligation for solar panels when they reach end of life.

02

Repowering cycle

Older solar farms are being assessed for replacement with higher output modules.

03

Domestic capability

Recyclon is planned as a dedicated UK facility for high recovery processing.

THE SOLUTION

High recovery processing with a controlled operating model

The planned facility will use a CE certified processing line designed to process up to 430,000 modules a year with three operators per shift.

Processing model
Fully automated line
Process inputs
Zero chemical process and zero water effluent
Energy use
180 kWh per processing cycle
Revenue model
Gate fees plus recovered material sales

INVESTMENT TERMS

A priced seed equity round

Terms below are drawn from the current priced equity term sheet.

Fundraise target£1,500,000
Pre money valuation£8,500,000
Post money valuation£10,000,000
Price per share£850
Minimum investment£100,300118 ordinary shares
Share classOrdinary shares

FINANCIAL PROJECTIONS

Operating projections at full capacity

These figures are projections, not guarantees. They assume the facility reaches full capacity and are subject to operational, market, financing and other risks.

Projected annual revenue£11.2MAt 100% capacity
Projected EBITDA£7.2MAt 100% capacity
Break even point£1.3MApprox. 49,000 panels per year
Projected investment recovery3 yearsAt full capacity
Projected IRR129%At full capacity. Not a guarantee.

DELIVERY MODEL

From panel intake to material recovery

  1. 01

    Accept

    Panels are accepted through the planned facility intake and gate fee model.

  2. 02

    Process

    Automation separates aluminium, copper, glass, silicon and plastic without chemical processing.

  3. 03

    Recover

    Recovered materials are intended for resale into established material markets.

THE TEAM

Built around solar and industrial delivery experience

RJ

Ricardo Jimenez

Chairman and CEO, Renergia Holdings Ltd

24 years in the energy sector, including solar. His background includes PETRONAS and Upsidevalue executive roles, Panasol facility delivery and a Go Global Award.

JC

Jack Cena

Solar manufacturing operations

Experience in solar manufacturing and operational leadership, including SunPower, Merlin Solar and Texas Instruments.

MB

Matteo Badalocchi

Design and engineering

Energy sector and facility-design experience, including work on the Panasol facility and senior engineering leadership roles.

WHY INVEST

Eight points to examine in the investor pack

The investment case should be assessed against the complete materials, diligence requirements and an investor’s own objectives. The page identifies the areas the proposed model is built around.

01

Low operating cost model

02

High recovery process

03

Defined initial capital requirement

04

WEEE related recycling demand

05

Planned diversified feedstock

06

Opportunity for phased growth

07

UK based material recovery

NEXT STEP

Review the opportunity with the team

Book a discussion with Stuart Storrer, or request the investor pack for review.

INVESTOR PACK

Request the Recyclon UK investor materials

Send your details to Stuart Storrer. He will reply directly with the current investor pack and next steps.

We collect only the details needed to respond to this request and manage the related investor conversation. Nothing is sold or added to a general marketing list.

See the SGS privacy policy.